Case studies
Manufacturing
Manufacturing – Aerospace Machining Shop (Southwest): Precision Scheduling & NADCAP Trace AI
Timeline: Build: 11 weeks. Deploy: cell-by-cell. Optimization: 9 weeks capacity models.
Business overview
Industry: precision aerospace machining. Complexity: AS9100, NADCAP processes.
Common pain points
Manual scheduling, paper travelers, audit panic.
Full AI automation system (PrimeAxiom solution)
Schedule Agent, Traveler Agent, Metrology Agent, Audit Binder Agent.
Automation workflow (detailed system flow)
1. Order release. 2. AI schedules finite capacity. 3. Digital traveler updates. 4. CMM results linked. 5. Non-conformance paths. 6. Human NCR decisions. 7. Audit PDF auto-built.
AI agents & logic
Scheduler Agent, Doc Agent, Quality Agent.
Technical architecture
MES integration, file watchers, LLM for narrative NCR drafts.
Tools & integrations
JobBOSS2, CMM file drops, PostgreSQL, OpenAI, barcode systems
Results
On-time delivery +21%; setup time waste −34%; audit prep hours −76%; scrap rate −18%.
Timeline
Build: 11 weeks. Deploy: cell-by-cell. Optimization: 9 weeks capacity models.